


Assembling the cabin took 6 days. All was left was the roof.



Assembling the cabin took 6 days. All was left was the roof.

Dave and Mary, Ron and Lynne, Art and Emily…all came up to Hornby to help build the beast.

The Denman ferry crew instructed me to drive fast onto the ferry, then jam on the brakes. This maneuver nudged the ferry off the ramp and allowed it to float free.

Had to leave my Cadillac behind. We were really going to rough it.